Keyword: closed-orbit
Paper Title Other Keywords Page
THC2C1 Shower Simulations for the CERN Proton Synchrotron Internal Dump and Comparison with Beam Loss Monitor Data simulation, proton, flattop, operation 389
 
  • S. Niang, L.S. Esposito, M. Giovannozzi, C. Hernalsteens, A. Huschauer, T. Pugnat
    CERN, Meyrin, Switzerland
  • D. Domange
    ULB, Bruxelles, Belgium
 
  During the Long Shutdown 2 (LS2), two new internal dumps (TDIs) were installed and successfully put into operation in the CERN Proton Synchrotron (PS) to withstand the intense and bright beams produced for the High Luminosity LHC. TDIs serve as safety devices designed to rapidly enter the beam trajectory and stop the beam over multiple turns. Due to their design, the TDI only absorbs a fraction of the secondary particle shower produced by beam particles that impinge on it. Starting from impacts computed by multi-turn beam dynamics simulations, detailed shower simulations were performed with FLUKA to assess the radiation field’s impact on the downstream equipment, with a particular emphasis on the dose measured by Beam Loss Monitors. The numerical data obtained from the simulations are compared with the experimental data collected during PS operation.  
slides icon Slides THC2C1 [2.092 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2023-THC2C1  
About • Received ※ 28 September 2023 — Revised ※ 09 October 2023 — Accepted ※ 10 October 2023 — Issued ※ 29 October 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THBP02 FFA Magnet for Pulsed High Power Proton Driver lattice, proton, software, operation 436
 
  • J.-B. Lagrange, C.W. Jolly, D.J. Kelliher, A.P. Letchford, S. Machida, I. Rodríguez, C.T. Rogers, J.D. Speed
    STFC/RAL/ISIS, Chilton, Didcot, Oxon, United Kingdom
  • S.J. Brooks
    BNL, Upton, New York, USA
  • T.-J. Kuo
    Imperial College of Science and Technology, Department of Physics, London, United Kingdom
 
  Fixed Field Alternating gradient (FFA) accelerator is considered as a proton driver for the next generation spallation neutron source (ISIS-II). To demonstrate its suitability for high intensity operation, an FFA proton prototype ring is planned at RAL, called FETS-FFA. The main magnets are a critical part of the machine, and several characteristics of these magnets require attention, such as doublet spiral structure, essential operational flexibility in terms of machine optics and control of the fringe field extent from the nonlinear optics point of view. This paper will discuss the design of the prototype magnet for FETS-FFA ring.  
poster icon Poster THBP02 [5.871 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2023-THBP02  
About • Received ※ 02 October 2023 — Revised ※ 08 October 2023 — Accepted ※ 12 October 2023 — Issued ※ 23 October 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THBP22 On Liouvillian High Power Beam Accumulation injection, emittance, accumulation, linac 511
 
  • J.-M. Lagniel
    GANIL, Caen, France
  • M.E. Eshraqi, N. Milas
    ESS, Lund, Sweden
 
  Funding: This work is co-funded by the European Union
It is acknowledged that the injection of high power proton beams into synchrotrons must be done using stripping injection of H⁻ beams which are accelerated by an injector, as done in many facilities worldwide such as ISIS, JPARC, SNS and CERN. However, this technique is not necessarily the only way of accumulation and in some cases might not represent the best choice. For example in the case of the ESSnuSB Accumulator Ring, accelerating the protons injecting them to the ring could represent savings in capital cost, reduced risk of losses in the linac and transfer lines and simplification to the overall project. This work presents the development of a method allowing to optimize the 4D Liouvillian accumulation of high-power proton and heavy ion beams and finishes with a discussion on the pros and cons of proton injection compared to more traditional H⁻ stripping injection method.
 
poster icon Poster THBP22 [2.126 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2023-THBP22  
About • Received ※ 01 October 2023 — Revised ※ 05 October 2023 — Accepted ※ 11 October 2023 — Issued ※ 28 October 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)