Paper |
Title |
Page |
MOA1I1 |
Beam Performance with the LHC Injectors Upgrade |
1 |
|
- G. Rumolo, S.C.P. Albright, R. Alemany-Fernández, M.E. Angoletta, C. Antuono, T. Argyropoulos, F. Asvesta, M.J. Barnes, H. Bartosik, P. Baudrenghien, G. Bellodi, N. Biancacci, C. Bracco, N. Bruchon, E. Carlier, J. Coupard, H. Damerau, G.P. Di Giovanni, A. Findlay, M.A. Fraser, A. Funken, R. Garoby, S.S. Gilardoni, B. Goddard, G. Hagmann, K. Hanke, A. Huschauer, G. Iadarola, V. Kain, I. Karpov, J.-B. Lallement, A. Lasheen, T.E. Levens, K.S.B. Li, A.M. Lombardi, E.H. Maclean, D. Manglunki, I. Mases Solé, M. Meddahi, L. Mether, B. Mikulec, E. Montesinos, Y. Papaphilippou, G. Papotti, K. Paraschou, C. Pasquino, F. Pedrosa, T. Prebibaj, S. Prodon, D. Quartullo, F. Roncarolo, B. Salvant, M. Schenk, R. Scrivens, E.N. Shaposhnikova, L. Sito, P.K. Skowroński, A. Spierer, R. Steerenberg, M. Sullivan, F.M. Velotti, R. Veness, C. Vollinger, R. Wegner, C. Zannini, E. de la Fuente
CERN, Meyrin, Switzerland
- T. Prebibaj
IAP, Frankfurt am Main, Germany
|
|
|
The LHC Injectors Upgrade (LIU) project was put in place between 2010 and 2021 to increase the intensity and brightness in the LHC injectors to match the challenging requirements of the High-Luminosity LHC (HL-LHC) project, while ensuring reliable operation of the injectors complex up to the end of the HL-LHC era (ca. 2040). During the 2019-2020 CERN accelerators shutdown, extensive hardware modifications were implemented in the entire LHC proton and ion injection chains, involving the new Linac4, the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS), the Super Proton Synchrotron (SPS) and the ion PS injectors, i.e. the Linac3 and the Low Energy Ion Ring (LEIR). Since 2021, beams have been recommissioned throughout the injectors’ chain and the beam parameters are being gradually ramped up to meet the LIU specifications using new beam dynamics solutions adapted to the upgraded accelerators. This paper focuses on the proton beams and describes the current state of the art.
|
|
|
Slides MOA1I1 [10.002 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-HB2023-MOA1I1
|
|
About • |
Received ※ 29 September 2023 — Revised ※ 05 October 2023 — Accepted ※ 09 October 2023 — Issued ※ 18 October 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THAFP08 |
Performance of the Ion Chain at the CERN Injector Complex and Transmission Studies During the 2023 Slip Stacking Commissioning |
418 |
|
- M. Slupecki, S.C.P. Albright, R. Alemany-Fernández, M.E. Angoletta, T. Argyropoulos, H. Bartosik, P. Baudrenghien, G. Bellodi, M. Bozzolan, R. Bruce, C. Carli, J. Cenede, H. Damerau, A. Frassier, D. Gamba, G. Hagmann, A. Huschauer, V. Kain, G. Khatri, D. Küchler, A. Lasheen, K.S.B. Li, E. Mahner, G. Papotti, G. Piccinini, A. Rey, M. Schenk, R. Scrivens, A. Spierer, G. Tranquille, D. Valuch, F.M. Velotti, R. Wegner
CERN, Meyrin, Switzerland
- E. Waagaard
EPFL, Lausanne, Switzerland
|
|
|
The 2023 run has been decisive for the LHC Ion Injector Complex. It demonstrated the capability of producing full trains of momentum slip stacked lead ions in the SPS. Slip stacking is a technique of interleaving particle trains, reducing the bunch spacing in SPS from 100 ns to 50 ns. It is needed to reach the total ion intensity requested by the HL-LHC project, as defined by updated common LIU/HL-LHC target beam parameters. This paper reviews the lead beam characteristics across the Ion Injector Complex, including transmission efficiencies up to the SPS extraction. It also documents the difficulties found during the commissioning and the solutions put in place.
|
|
|
Slides THAFP08 [1.114 MB]
|
|
|
Poster THAFP08 [1.995 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-HB2023-THAFP08
|
|
About • |
Received ※ 01 October 2023 — Revised ※ 07 October 2023 — Accepted ※ 11 October 2023 — Issued ※ 21 October 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|