THC1I2 | FRIB Beam Power Ramp-up: Status and Plans | 351 |
|
||
Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661. After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration. |
||
Slides THC1I2 [4.065 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-HB2023-THC1I2 | |
About • | Received ※ 01 October 2023 — Revised ※ 09 October 2023 — Accepted ※ 10 October 2023 — Issued ※ 30 October 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |