Author: Bellodi, G.
Paper Title Page
MOA1I1 Beam Performance with the LHC Injectors Upgrade 1
 
  • G. Rumolo, S.C.P. Albright, R. Alemany-Fernández, M.E. Angoletta, C. Antuono, T. Argyropoulos, F. Asvesta, M.J. Barnes, H. Bartosik, P. Baudrenghien, G. Bellodi, N. Biancacci, C. Bracco, N. Bruchon, E. Carlier, J. Coupard, H. Damerau, G.P. Di Giovanni, A. Findlay, M.A. Fraser, A. Funken, R. Garoby, S.S. Gilardoni, B. Goddard, G. Hagmann, K. Hanke, A. Huschauer, G. Iadarola, V. Kain, I. Karpov, J.-B. Lallement, A. Lasheen, T.E. Levens, K.S.B. Li, A.M. Lombardi, E.H. Maclean, D. Manglunki, I. Mases Solé, M. Meddahi, L. Mether, B. Mikulec, E. Montesinos, Y. Papaphilippou, G. Papotti, K. Paraschou, C. Pasquino, F. Pedrosa, T. Prebibaj, S. Prodon, D. Quartullo, F. Roncarolo, B. Salvant, M. Schenk, R. Scrivens, E.N. Shaposhnikova, L. Sito, P.K. Skowroński, A. Spierer, R. Steerenberg, M. Sullivan, F.M. Velotti, R. Veness, C. Vollinger, R. Wegner, C. Zannini, E. de la Fuente
    CERN, Meyrin, Switzerland
  • T. Prebibaj
    IAP, Frankfurt am Main, Germany
 
  The LHC Injectors Upgrade (LIU) project was put in place between 2010 and 2021 to increase the intensity and brightness in the LHC injectors to match the challenging requirements of the High-Luminosity LHC (HL-LHC) project, while ensuring reliable operation of the injectors complex up to the end of the HL-LHC era (ca. 2040). During the 2019-2020 CERN accelerators shutdown, extensive hardware modifications were implemented in the entire LHC proton and ion injection chains, involving the new Linac4, the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS), the Super Proton Synchrotron (SPS) and the ion PS injectors, i.e. the Linac3 and the Low Energy Ion Ring (LEIR). Since 2021, beams have been recommissioned throughout the injectors’ chain and the beam parameters are being gradually ramped up to meet the LIU specifications using new beam dynamics solutions adapted to the upgraded accelerators. This paper focuses on the proton beams and describes the current state of the art.  
slides icon Slides MOA1I1 [10.002 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2023-MOA1I1  
About • Received ※ 29 September 2023 — Revised ※ 05 October 2023 — Accepted ※ 09 October 2023 — Issued ※ 18 October 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEA3C2 Benchmarking of PATH and RF-Track in the Simulation of Linac4 249
 
  • G. Bellodi, J.-B. Lallement, A. Latina, A.M. Lombardi
    CERN, Meyrin, Switzerland
 
  A benchmarking campaign has been initiated to compare PATH and RF-Track in modelling high-intensity, low-energy hadron beams. The development of extra functionalities in RF-Track was required to handle an unbunched beam from the source and to ease the user interface. The Linac4 RFQ and downstream accelerating structures were adopted as test case scenarios. This paper will give an overview of the results obtained so far and plans for future code development.  
slides icon Slides WEA3C2 [4.809 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2023-WEA3C2  
About • Received ※ 27 September 2023 — Revised ※ 07 October 2023 — Accepted ※ 09 October 2023 — Issued ※ 18 October 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEA4I2 Linac4 Source and Low Energy Experience and Challenges 290
 
  • E. Sargsyan, G. Bellodi, F.D.L. Di Lorenzo, J. Etxebarria, J.-B. Lallement, A.M. Lombardi, M. O’Neil
    CERN, Meyrin, Switzerland
 
  At the end of Long Shutdown 2 (LS2), in 2020 Linac4 became the new injector of CERN’s proton accelerator complex. The previous version of the Linac4 H⁻ ion source (IS03), produced an operational pulsed peak beam current of 35 mA, resulting in 27 mA after the Radio-Frequency Quadrupole (RFQ). This limited transmission was mainly due to the extracted beam emittance exceeding the acceptance of the RFQ. A new geometry of the Linac4 source extraction electrodes has been developed with the aim of decreasing the extracted beam emittance and increasing the transmission through the RFQ. The new source (IS04) has been studied and thoroughly tested at the Linac4 source test stand. At the start of the 2023 run, the IS04 was installed as operational source in the Linac4 tunnel and is being successfully used for operation with 27 mA peak current after the RFQ. During high-intensity tests, the source, the linac, and the transfer-line to the Proton Synchrotron Booster (PSB) were also tested with a peak beam current of up to 50 mA from the source resulting in 35 mA at the PSB injection. This paper discusses the recent developments, tests, and future plans for the Linac4 H⁻ ion source.  
slides icon Slides WEA4I2 [2.217 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2023-WEA4I2  
About • Received ※ 27 September 2023 — Revised ※ 06 October 2023 — Accepted ※ 09 October 2023 — Issued ※ 29 October 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THAFP08 Performance of the Ion Chain at the CERN Injector Complex and Transmission Studies During the 2023 Slip Stacking Commissioning 418
 
  • M. Slupecki, S.C.P. Albright, R. Alemany-Fernández, M.E. Angoletta, T. Argyropoulos, H. Bartosik, P. Baudrenghien, G. Bellodi, M. Bozzolan, R. Bruce, C. Carli, J. Cenede, H. Damerau, A. Frassier, D. Gamba, G. Hagmann, A. Huschauer, V. Kain, G. Khatri, D. Küchler, A. Lasheen, K.S.B. Li, E. Mahner, G. Papotti, G. Piccinini, A. Rey, M. Schenk, R. Scrivens, A. Spierer, G. Tranquille, D. Valuch, F.M. Velotti, R. Wegner
    CERN, Meyrin, Switzerland
  • E. Waagaard
    EPFL, Lausanne, Switzerland
 
  The 2023 run has been decisive for the LHC Ion Injector Complex. It demonstrated the capability of producing full trains of momentum slip stacked lead ions in the SPS. Slip stacking is a technique of interleaving particle trains, reducing the bunch spacing in SPS from 100 ns to 50 ns. It is needed to reach the total ion intensity requested by the HL-LHC project, as defined by updated common LIU/HL-LHC target beam parameters. This paper reviews the lead beam characteristics across the Ion Injector Complex, including transmission efficiencies up to the SPS extraction. It also documents the difficulties found during the commissioning and the solutions put in place.  
slides icon Slides THAFP08 [1.114 MB]  
poster icon Poster THAFP08 [1.995 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2023-THAFP08  
About • Received ※ 01 October 2023 — Revised ※ 07 October 2023 — Accepted ※ 11 October 2023 — Issued ※ 21 October 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)