Paper |
Title |
Page |
THBP50 |
Fermilab Main Injector and Recycler Operations in the Megawatt Era |
607 |
|
- A.P. Schreckenberger
Fermilab, Batavia, Illinois, USA
|
|
|
Significant upgrades to Fermilab¿s accelerator complex have accompanied the development of LBNF and DUNE. These improvements will facilitate 1-MW operation of the NuMI beam for the first time this year through changes to the Recycler slip-stacking procedure and shortening of the Main Injector ramp time. The modifications to the Recycler slip-stacking and effort to reduce the Main Injector ramp time will be discussed. Additionally, details regarding further shortening of the ramp time and the impact on future accelerator operations are presented.
|
|
|
Poster THBP50 [0.923 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-HB2023-THBP50
|
|
About • |
Received ※ 25 September 2023 — Revised ※ 09 October 2023 — Accepted ※ 12 October 2023 — Issued ※ 12 October 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|