Author: Meshkov, I.N.
Paper Title Page
THBP55 Commissioning of NICA Injection Complex 618
 
  • V.A. Lebedev, O.I. Brovko, A.V. Butenko, E.E. Donets, B.V. Golovenskiy, E.V. Gorbachev, S.A. Kostromin, K.A. Levterov, I.N. Meshkov, A.S. Sergeev, M.M. Shandov, A.O. Sidorin, V.L. Smirnov, E. Syresin, A. Tuzikov
    JINR, Dubna, Moscow Region, Russia
  • I. Nikolaichuk, A.Yu. Ramsdorf
    JINR/VBLHEP, Dubna, Moscow region, Russia
 
  The Nuclotron-based Ion Collider fAcility (NICA) is under construction at JINR. The NICA project goal is to provide colliding beams for studies of collisions of heavy fully stripped ions and light p¿lairized ions. The NICA Collider includes two rings with 503 m circumference each and the injection complex. For the heavy ion mode, the injection complex consists of following accelerators: 3.2 MeV/u linac (HILAC), 600 MeV/u (A/Z=6) superconducting booster synchrotron (Booster) and main superconducting synchrotron (Nuclotron) with kinetic energy up to 3.9 GeV/u (A/Z=2.5). The injection complex has been under commissioning for more than 2 years. Its Run IV was carried from October 2022 to February of 2023. It was aimed on the injection complex preparation for the collider operations in the heavy ion mode. Additionally, the slowly extracted 3.9 GeV/u xenon beam was delivered to the BM&N experiment resulting in 250 million events in the detector. The paper discusses main results of the injection complex commissioning and plans for its further development. The beam commissioning of the collider is expected in the 2nd half of 2025.  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2023-THBP55  
About • Received ※ 26 September 2023 — Revised ※ 06 October 2023 — Accepted ※ 11 October 2023 — Issued ※ 17 October 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)